The EPC contract is under construction and executed by Goharroosh Sirjan Company. The plant started operations in June 1977 and has two dry feed recovery lines with a production capacity of 600,000 tons per year, two more feed recovery lines with a capacity of 400,000 tons per year. It has doubled the number and capacity of its lines twice a year compared to the current hematite plant. It also has a feed capacity of 4 million tonnes per year. Other capabilities of the plant are the ability to increase production to 1.6 million tonnes of concentrate per year.
The concentrate produced in this company has 65% iron grade and less than 100 micron grading. The feedstock of this plant has been estimated with available materials for 8 years and the design of the plant has been designed to continue the feed flexibility with grain. Hematite and magnetite classification is possible.
Kavian Gohar Hematite Recovery Plant Project
- Details
- Written by Super User
- Category: About Goharravesh
- Hits: 3632