At the planning stop of condensing line 3, new technology for furnace firing and docking was first introduced. Running speed is in the works. Due to mine explosions and vibrations, refractory bricks were cracked, which was eliminated by this action. More than 140 tons of refractory materials and 5 types of refractory materials were removed within 15 days. This set was used.Also docking switch 6m * 9m * 9m without removing the factory roof and without Emoshi factory is a record. Thanks to the esteemed employer (Gol Gohar) for their constant support, he added: "At this opportunity all dry mill liners with 17 positions were replaced and another stop was prevented.

Call Us

Adress : sirjan - imam alley - ostad motahari .St - corner of dr fatemi - no 28

Postal Code : 7816959379     

Tell : 034 - 42250213-42256602

PRTell : 034 - 41423601

Fax: 034 - 42251641-42251038

Email : info@grsco.ir 

Template Design:Dima Group